KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  4-18-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Static Balancing

For the static balancing of the elevator I had to mould the lead into the form made from plaster. Lead has a melting point of 328 C°. The form was according to the plans 80x30x40. This volume gives a weight of about 1.1KG. Preinstalled M4 bolts into the mold so I wouldn't have to drill the lead later on.
' style=

Balsa Male for making the the Mold

Balsa Male for making the the Mold

' style=

Metall Bucket with wooden Plate

Metall Bucket with wooden Plate

' style=

Drilled M4 Holes for Bolts

Drilled M4 Holes for Bolts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.